Arboleaf App

Unleash potential, Conquer goals

One home for every insight, goal, and celebration.

Arboleaf

Join our community

share the latest health insights.

Body Composition Scan

Step on any arboleaf smart scale and the app instantly records weight, body-fat, muscle, water, bone, and more—14 core metrics in a single read. You get lab-grade accuracy at home, every day.

Circumference Tracking

Wrap the arboleaf smart tape around your waist, hips, arms, or thighs; one tap logs the exact millimeter. Size changes that a mirror can’t spot become crystal-clear data points.

Progress Charts

All scale and tape readings flow into color-coded weekly and monthly graphs, making long-term trends impossible to miss and quick wins easy to celebrate.

Weekly Health Report

Every Monday the app delivers a concise PDF recap—highlights, lowlights, and a quick “next-step” nudge—so you start each week with the right focus.

Arboleaf app leg analysis page displaying muscle

Professional Segmental Analysis

Unlock limb-by-limb metrics—26 in total—by stepping on the Segmental Body Scale CS10E. See how muscle and fat distribute across arms, legs, and torso, then tailor workouts with surgical precision.

Track Vitals

Instant Vitals, Instant Insight

Use your phone camera or a connected finger sensor to capture resting HR and blood-oxygen saturation. Vital signs appear beside weight and body-fat for a true 360-degree snapshot.



Sync, See Trends

Pair an arboleaf BPM via Bluetooth to pull systolic, diastolic, and pulse data straight into the dashboard. Correlate BP trends with body composition and lifestyle changes for deeper insight.